Please click the button below to view and/or download the Water & Wastewater Development Fee Study, prepared by Willian Financial Services:

Public input will be available for 45 days from October 13, 2023. To provide input, please complete the form below:

2023 System Development Fees Public Input Form

Name(Required)
Address(Required)
Email(Required)
Please let us know what's on your mind. Have a question for us? Ask away.

Current System Development & Tap Fees

USEEXISTING WATER SDFEXISTING SEWER SDFEXISTING FEE TOTALSPROPOSED WATER SDFPROPOSED SEWER SDFPROPOSED FEE TOTALSOVERALL DIFFERENCE
New 3-Bedroom Residential

(water 400 gpd minimum; sewer 120 gpd per bedroom)

$1700

(400 gpd) x $4.25 per gallon

$15,847

(360 gpd) x $44.02
per gallon)

$17,547$1,910

(400 gpd) x $4.78
per gallon

$19,900

(360 gpd) x $55.30
per gallon

$21,810$4,263
New Real Estate Office with 5 Employees, open 9am-5pm

(water and sewer 25 gpd per employee)

$531

(25 gpd x 5 employees = 125 gpd) x $4.25 per gallon

$5,503

(25 gpd x 5
employees = 125
gpd) x $44.02 per
gallon

$6,034$597

(25 gpd x 5
employees = 125
gpd) x $4.78 per
gallon

$6,910

(25 gpd x 5
employees = 125 gpd)
x $55.30 per gallon

$7,507$1,473
New Full Service Restaurant, 40 seats

(water and sewer calculated at 40 gpd per seat)

$6,800

(40 gpd x 40 seats = 1600 gpd) x $4.25 per gallon)

$70,432

(40 gpd x 40
seats = 1600 gpd) x
$44.02 per gallon

$77,232$7,648

(40 gpd x 40
seats = 1600 gpd) x
$4.78 per gallon

$88,480
(40 gpd x 40
seats = 1600 gpd) x
$55.30 per gallon
$96,128$18,896
New Hair Salon, 6 stations/bowls

(125 gpd per station)

$3,188

(125 gpd x 6 bowls = 750 gpd) x $4.25 per gallon

$33,015

(125 gpd x 6
bowls = 750 gpd) x
$44.02 per gallon

$36,203$3,585

(125 gpd x 6
bowls = 750 gpd) x
$4.78 per gallon

$41,475
(125 gpd x 6
bowls = 750 gpd) x
$55.30 per gallon
$45,060$8,857

Sewer System Development Fees

Residential Sewer System Development Fees
2 bedroom: $10,565 (240 gpd)
3 bedroom: $15,847 (360 gpd)
4 bedroom: $21,130 (480 gpd)

Sewer Tap Fees

  • Short Side sewer tap within staff capability: $1,500
  • Sewer taps above staff capability (contractor can be hired by builder and city to inspect or city-hired contractor: cost + 10%
  • Long Side sewer tap (contractor to do bore, no more road cuts): cost + 10%
  • Sewer taps that require pavement disturbance; builder to be responsible for pavement replacement or cost + 10%

Meter Tampering
1st offense: $100 fine
2nd offense: $500 fine
3rd offense: $1,000 fine

Effective July 1, 2022 – Sewer System Development Fees: $44.02 per gallon

Where extraordinary measures are necessary to accomplish a sewer tap, the cost to make the tap shall be based on time and materials, plus an administrative fee of 10%. This will be in lieu of the base tap fee.

Commercial Sewer System Development Fees
Commercial customers must contact the Public Services Director at (910) 457-7935 for the calculation of Commercial System Development Fees.

Water System Development Fees

Establishing a new meter connection

Effective July 1, 2022: Water System Development Fees: $4.25 per gallon
2 bedroom: $1,700 (400 gpd)
3 bedroom: $1,700 (400 gpd)
4 bedroom: $2,244 (528 gpd)