CONSTRUCTION AND DEVELOPMENT RATES

Sewer System Development Fees

Residential Sewer System Development  Fees

2 bedroom $10,565 (240 gpd)
3 bedroom $15,847 (360 gpd)
4 bedroom $21,130 (480 gpd)

Sewer Tap Fees

  • Short Side sewer tap within staff capability: $1,500
  • Sewer taps above staff capability (contractor can be hired by builder and city to inspect or city-hired contractor: cost plus 10%
  • Long Side sewer tap (contractor to do bore, no more road cuts): cost plus 10%
  • Sewer taps that require pavement disturbance; builder to be responsible for pavement replacement or cost plus 10%

Meter Tampering

1st offense: $100
2nd offense: $500
3rd offense: $1,000

Effective July 1, 2022.  Sewer System Development Fees: $44.02 per gallon

Where extraordinary measures are necessary to accomplish a sewer tap, the cost to make the tap shall be based on time and materials, plus an administrative fee of 10%. This will be in lieu of the base tap fee.

Commercial Sewer System Development  Fees

Commercial customers must contact the Public Services Director at (910) 457-7935 for the calculation of commercial system development fees.

Water Tap Fees

(Establishing a new meter connection)

Water Tap 
3/4 in. $1,100.00
1 in. $1,200.00
New Meter for Existing Tap $500.00

Irrigation Tap
Separate Irrigation Tap $1,100.00
Split Irrigation Tap $750.00

Where extraordinary measures are necessary to accomplish a water tap, the cost to make the tap shall be based on time and materials, plus an administrative fee of 10%. shall be applied in lieu of the base tap fee.

Water System Development Fees

(Establishing a new meter connection)

Effective July 1, 2022.  Water System Development Fees: $4.25 per gallon

The Number of Bedrooms Fee:

2 bedroom $1,700.00 (400 gpd)
3 bedroom $1,700.00 (400 gpd)
4 bedroom $2,244.00 (528 gpd)